NS-Stud Welding Method for Connecting Steel Pipe Sheet Piles to Footing Concrete of Steel Pipe Sheet Pile Foundation
In the temporary cofferdam sharing method for steel pipe sheet pile foundation, steel pipe sheet piles must be connected to footing concrete. For the connection, a deformed bar stud welding method (NS Stud Welding Method) has been developed in which long deformed bar studs of 19 mm in diameter are directly welded to steel pipe sheet piles. The method can considerably reduce construction time and costs.
NS-Stud Welding Method for Connecting Steel Pipe Sheet Piles to Footing Concrete of Steel Pipe Sheet Pile Foundation
In the temporary cofferdam sharing method for steel pipe sheet pile foundation, steel pipe sheet piles must be connected to footing concrete. For the connection, a deformed bar stud welding method (NS Stud Welding Method) has been developed in which long deformed bar studs of 19 mm in diameter are directly welded to steel pipe sheet piles. The method can considerably reduce construction time and costs.
NS-Stud Welding Method for Connecting Steel Pipe Sheet Piles to Footing Concrete of Steel Pipe Sheet Pile Foundation
T. Katayama (author) / K. Kawakami (author) / R. Kohno (author) / H. Tachikawa (author)
1989
8 pages
Report
No indication
English
European Patent Office | 2016
|Development of sheet-pile foundation combining footing with sheet-piles
British Library Conference Proceedings | 2007
|JOINT STRUCTURE CONNECTING STEEL SHEET PILE WITH STEEL PIPE SHEET PILE
European Patent Office | 2016
|