A platform for research: civil engineering, architecture and urbanism
Subsurface Investigation, Section E001, Greenbelt Route
Results are summarized of seventeen supplementary test borings made to investigate conditions along the line of tunnels and two planned cut-and-cover stations on 7th Street N.W. between H Street and U Street in Section E001 of the Greenbelt Route of the Washington Metropolitan Area Metro System. The report contains a continuous longitudinal geological section along the subway line, logs of the test borings, results of laboratory tests performed on samples obtained and a text summarizing anticipated design and construction problems.
Subsurface Investigation, Section E001, Greenbelt Route
Results are summarized of seventeen supplementary test borings made to investigate conditions along the line of tunnels and two planned cut-and-cover stations on 7th Street N.W. between H Street and U Street in Section E001 of the Greenbelt Route of the Washington Metropolitan Area Metro System. The report contains a continuous longitudinal geological section along the subway line, logs of the test borings, results of laboratory tests performed on samples obtained and a text summarizing anticipated design and construction problems.
Subsurface Investigation, Section E001, Greenbelt Route
1974
32 pages
Report
No indication
English
Road Transportation , Geology & Geophysics , Civil Engineering , Subway railways , District of Columbia , Routes , Subsurface investigations , Foundations , Rock mechanics , Soil mechanics , Tunneling(Excavation) , Subsurface structures , Boring , Subsoil , Urban transportation , Mass transportation , Urban planning , Greenbelt Route , Foundation engineering , Design section E001