A platform for research: civil engineering, architecture and urbanism
Georgia Avenue Station and Double Crossover, Section E004, Greenbelt Route, Supplementary Subsurface Investigation
Results are summarized herein of eleven test borings to investigate subsurface conditions at the planned location of Georgia Avenue Station and double crossover between Stations 164+55 and 177+40 in Section E004 of Greenbelt Route. The report contains geological sections which summarize information from test borings, logs of borings, results of water pressure tests in rock and laboratory tests performed on soil samples recovered and text describing design and construction problems.
Georgia Avenue Station and Double Crossover, Section E004, Greenbelt Route, Supplementary Subsurface Investigation
Results are summarized herein of eleven test borings to investigate subsurface conditions at the planned location of Georgia Avenue Station and double crossover between Stations 164+55 and 177+40 in Section E004 of Greenbelt Route. The report contains geological sections which summarize information from test borings, logs of borings, results of water pressure tests in rock and laboratory tests performed on soil samples recovered and text describing design and construction problems.
Georgia Avenue Station and Double Crossover, Section E004, Greenbelt Route, Supplementary Subsurface Investigation
1991
123 pages
Report
No indication
English
Civil Engineering , Soil & Rock Mechanics , Metropolitan Rail Transportation , Transportation & Traffic Planning , Transportation , Subsurface investigations , Borings , Soil profiles , Rapid transit railways , Drawings , Tables(Data) , Soil tests , Urban planning , Design , Urban transportation , Mass transportation , Foundations , Engineering geology , Construction , Soil mechanics , Rock mechanics , Greenbelt route , WAMATA