A platform for research: civil engineering, architecture and urbanism
Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam
This study investigated hydroelectric development at Mines Falls Dam in Nashua New Hampshire. Reinstallation of hydroelectric power at Mines Falls Dam has been determined feasible. Two hydroelectric development plans were looked at in detail: (1) hydroelectric development at the dam site, (2) development along the canal about one mile downstream of the dam. Development at the dam was determined to be the most practical and feasible as it would not disturb the delicate canal system. (Author)
Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam
This study investigated hydroelectric development at Mines Falls Dam in Nashua New Hampshire. Reinstallation of hydroelectric power at Mines Falls Dam has been determined feasible. Two hydroelectric development plans were looked at in detail: (1) hydroelectric development at the dam site, (2) development along the canal about one mile downstream of the dam. Development at the dam was determined to be the most practical and feasible as it would not disturb the delicate canal system. (Author)
Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 2. Mine Falls Dam
1980
144 pages
Report
No indication
English
Causes and prevention of mine roof falls
Engineering Index Backfile | 1946
|Mine roof sealing to prevent slate falls
Engineering Index Backfile | 1943