A platform for research: civil engineering, architecture and urbanism
National Program for Inspection of Non-Federal Dams. Hamilton Reservoir Dam MA 00536, Thames River Basin, Holland, Massachusetts. Phase 1, Inspection Report
The dam is an earthfill embankment and concrete spillway dam. It is about 100 ft. long and has a maximum height of 17 ft. The project is considered to be in good condition. It is intermediate in size with a significant hazard potential. It is recommended that the owner retain a competent consulting engineer to conduct further studies to determine the measures that are necessary to improve the discharge capacities.
National Program for Inspection of Non-Federal Dams. Hamilton Reservoir Dam MA 00536, Thames River Basin, Holland, Massachusetts. Phase 1, Inspection Report
The dam is an earthfill embankment and concrete spillway dam. It is about 100 ft. long and has a maximum height of 17 ft. The project is considered to be in good condition. It is intermediate in size with a significant hazard potential. It is recommended that the owner retain a competent consulting engineer to conduct further studies to determine the measures that are necessary to improve the discharge capacities.
National Program for Inspection of Non-Federal Dams. Hamilton Reservoir Dam MA 00536, Thames River Basin, Holland, Massachusetts. Phase 1, Inspection Report
1978
83 pages
Report
No indication
English