Accurate Directional Borehole Drilling: A Case Study at Navajo Dam, New Mexico
The report describes a project conducted by the Bureau of Mines in which the accurate directional drilling of a borehole was demonstrated with the objective of intercepting a designated target. The project was conducted at Navajo Dam in northern New Mexico at the request of the Bureau of Reclamation. Borehole survey and drill logs are provided in an appendix. The trajectory of the demonstration borehole was designed to intercept a 5-ft-radius target at the final or 'punchout' distance of 885 ft. As a result of the demonstrated accuracy, the Bureau of Reclamation has contracted the accurate drilling of boreholes as long as 600 ft from the inside of a short tunnel, to control water seepage in the right abutment. This resulted in a substantial cost savings compared to the original plan of constructing a longer tunnel and drilling 150-ft boreholes.
Accurate Directional Borehole Drilling: A Case Study at Navajo Dam, New Mexico
The report describes a project conducted by the Bureau of Mines in which the accurate directional drilling of a borehole was demonstrated with the objective of intercepting a designated target. The project was conducted at Navajo Dam in northern New Mexico at the request of the Bureau of Reclamation. Borehole survey and drill logs are provided in an appendix. The trajectory of the demonstration borehole was designed to intercept a 5-ft-radius target at the final or 'punchout' distance of 885 ft. As a result of the demonstrated accuracy, the Bureau of Reclamation has contracted the accurate drilling of boreholes as long as 600 ft from the inside of a short tunnel, to control water seepage in the right abutment. This resulted in a substantial cost savings compared to the original plan of constructing a longer tunnel and drilling 150-ft boreholes.
Accurate Directional Borehole Drilling: A Case Study at Navajo Dam, New Mexico
S. J. Kravits (author) / A. Sainato (author) / G. L. Finfinger (author)
1986
32 pages
Report
No indication
English
Demonstrating Borehole Drilling Accuracy at the Navajo Dam
British Library Conference Proceedings | 1988
|Stability analysis of a borehole wall during horizontal directional drilling
British Library Online Contents | 2007
|GCT-239 PREDICTION OF BOREHOLE PRESSURES IN HORIZONTAL DIRECTIONAL DRILLING
British Library Conference Proceedings | 2003
|Stability analysis of a borehole wall during horizontal directional drilling
Online Contents | 2007
|