A platform for research: civil engineering, architecture and urbanism
Asbestos-cement panels test report, 100K Area, Hanford, Washington
The 105KE/105KW reactor facilities were constructed in the mid-1950s. The 105KE/105KW fuel-basin roof panels are in a radiation controlled area where there is smearable contamination. The roof panels in all of the inspected areas were constructed from corrugated asbestos-cement (A/C) panels. The corrugated A/C roof panels exhibit common signs of aging including cracking, chipping, spalling, or a combination of these processes. Westinghouse Hanford Company (WHC) has engaged Wiss, Janney, Elstner Associates, Inc. (WJE) to perform laboratory and field tests on A/C roof panels of the 105KW building and also to make recommendations for panel replacement, maintenance, or upgrade that will maintain the structural integrity of the roof panels for an additional 20 years of service. This report contains the results of laboratory and in-situ testing performed by WJE. A Roof Proof Load Test Plan was prepared for WJE and approved by WHC. Conclusions and recommendations based on test results are presented for the 190-KE wall panels and 105KW roof panels.
Asbestos-cement panels test report, 100K Area, Hanford, Washington
The 105KE/105KW reactor facilities were constructed in the mid-1950s. The 105KE/105KW fuel-basin roof panels are in a radiation controlled area where there is smearable contamination. The roof panels in all of the inspected areas were constructed from corrugated asbestos-cement (A/C) panels. The corrugated A/C roof panels exhibit common signs of aging including cracking, chipping, spalling, or a combination of these processes. Westinghouse Hanford Company (WHC) has engaged Wiss, Janney, Elstner Associates, Inc. (WJE) to perform laboratory and field tests on A/C roof panels of the 105KW building and also to make recommendations for panel replacement, maintenance, or upgrade that will maintain the structural integrity of the roof panels for an additional 20 years of service. This report contains the results of laboratory and in-situ testing performed by WJE. A Roof Proof Load Test Plan was prepared for WJE and approved by WHC. Conclusions and recommendations based on test results are presented for the 190-KE wall panels and 105KW roof panels.
Asbestos-cement panels test report, 100K Area, Hanford, Washington
S. E. Moustafa (author)
1993
110 pages
Report
No indication
English
Reactor Engineering & Nuclear Power Plants , Materials Degradation & Fouling , Construction Materials, Components, & Equipment , Hanford Reservation , Roofs , Service Life , Buildings , Aging , Augmentation , Bench-Scale Experiments , Field Tests , Hanford Production Reactors , Maintenance , Recommendations , Static Loads , Asbestos , EDB/360603 , EDB/420500
Online Contents | 2009
|Hanford Site Asbestos Abatement Plan (HSAAP). Revision 1
NTIS | 1995
|2018 Salary & Career Report: Is $100K Enough for You?
British Library Online Contents | 2018