A platform for research: civil engineering, architecture and urbanism
Innovative Bridge Designs for Rapid Renewal
This report documents and presents the results of SHRP 2 Renewal Project R04, Innovative Bridge Designs for Rapid Renewal, to develop standardized approaches to designing and constructing complete bridge systems for rapid renewals. Bridge deterioration and the need for replacement continue to be ongoing problems in the United States. Accelerated bridge construction (ABC) techniques have the potential to minimize traffic disruptions during bridge renewals, to promote traffic and worker safety, and to improve the overall quality and durability of bridges.
Innovative Bridge Designs for Rapid Renewal
This report documents and presents the results of SHRP 2 Renewal Project R04, Innovative Bridge Designs for Rapid Renewal, to develop standardized approaches to designing and constructing complete bridge systems for rapid renewals. Bridge deterioration and the need for replacement continue to be ongoing problems in the United States. Accelerated bridge construction (ABC) techniques have the potential to minimize traffic disruptions during bridge renewals, to promote traffic and worker safety, and to improve the overall quality and durability of bridges.
Innovative Bridge Designs for Rapid Renewal
2014
619 pages
Report
No indication
English
Innovative sea defence renewal
British Library Online Contents | 2006
Engineering Index Backfile | 1902
An interesting method of bridge renewal
Engineering Index Backfile | 1913