A platform for research: civil engineering, architecture and urbanism
Field Investigation of a Prestressed Concrete Highway Bridge Located in Douglas County, Illinois
Camber, strain, creep, and shrinkage measurements were made over a period of 2 years on a 3-span prestressed concrete highway bridge and concrete specimens. The precast I-section girders, 72 ft. 9 in. long, were made continuous for live-load forces by reinforcement cast in the deck. The construction of the bridge is described, as is the instrumentation used. (Author)
Field Investigation of a Prestressed Concrete Highway Bridge Located in Douglas County, Illinois
Camber, strain, creep, and shrinkage measurements were made over a period of 2 years on a 3-span prestressed concrete highway bridge and concrete specimens. The precast I-section girders, 72 ft. 9 in. long, were made continuous for live-load forces by reinforcement cast in the deck. The construction of the bridge is described, as is the instrumentation used. (Author)
Field Investigation of a Prestressed Concrete Highway Bridge Located in Douglas County, Illinois
D. M. Houdeshell (author) / T. C. Anderson (author) / W. L. Gamble (author)
1972
143 pages
Report
No indication
English
Standardization of prestressed concrete Highway Bridge members
Engineering Index Backfile | 1962
|Field investigation of prestressed reinforced concrete highway bridges
Engineering Index Backfile | 1967
|