A platform for research: civil engineering, architecture and urbanism
Tables of Minimum Striking Times for Soffit and Vertical Formwork
Times for the removal of soffit and vertical formwork are given in tabular form. These relate to five grades of concrete containing ordinary or rapid hardening Portland cement and a range of concrete placing and ambient temperatures. The tables are preceded by explanatory notes on their derivation and examples of their use.
Tables of Minimum Striking Times for Soffit and Vertical Formwork
Times for the removal of soffit and vertical formwork are given in tabular form. These relate to five grades of concrete containing ordinary or rapid hardening Portland cement and a range of concrete placing and ambient temperatures. The tables are preceded by explanatory notes on their derivation and examples of their use.
Tables of Minimum Striking Times for Soffit and Vertical Formwork
T. A. Harrison (author)
1979
29 pages
Report
No indication
English
Pressures on formwork and striking times
Online Contents | 1998
Pressures on formwork and striking times
British Library Online Contents | 1998
Formwork striking times - methods of assessment
Elsevier | 1988
|Formwork Striking Times - Methods of Assessment
NTIS | 1977
|CONCRETE FORMWORK STRIKING JIG, AND CONCRETE FORMWORK STRIKING DEVICE
European Patent Office | 2021
|