A platform for research: civil engineering, architecture and urbanism
This report concerns the monitoring of a portion of the Bonnet Carre Spillway Bridge during an extreme overload. On Tuesday, November 5, 2002, Tulane University was requested to monitor strain at the bottom flange of two adjacent prestressed girders before, during, and after the passing of the overload. On Thursday, November 7, this request was modified to include monitoring of strain in the following regions of interest: (1) Positive moment region on three adjacent girders; (2) Negative moment region over the pile cap at the center of the bridge width; (3) Positive and negative moment region on one pile cap; (4) Shear region on one pile cap. and (5) Compression region on one square pile.
This report concerns the monitoring of a portion of the Bonnet Carre Spillway Bridge during an extreme overload. On Tuesday, November 5, 2002, Tulane University was requested to monitor strain at the bottom flange of two adjacent prestressed girders before, during, and after the passing of the overload. On Thursday, November 7, this request was modified to include monitoring of strain in the following regions of interest: (1) Positive moment region on three adjacent girders; (2) Negative moment region over the pile cap at the center of the bridge width; (3) Positive and negative moment region on one pile cap; (4) Shear region on one pile cap. and (5) Compression region on one square pile.
Monitoring of the Bonnet Carre Spillway Bridge during Extreme Overload
2003
71 pages
Report
No indication
English
Superload Evaluation of the Bonnet CarreĀ“ Spillway Bridge
Online Contents | 2008
|Problems in design, Bonnet Carre spillway
Engineering Index Backfile | 1929
|Design and construction of Bonnet Carre spillway
Engineering Index Backfile | 1931
|Four long trestles cross bonnet carre spillway
Engineering Index Backfile | 1935
|Hydraulic experiments at the Bonnet Carre spillway
Engineering Index Backfile | 1929
|