A platform for research: civil engineering, architecture and urbanism
Guide Design Specification for Bridge Temporary Works
Following the collapse of the Route 198 bridge over the Baltimore/Washington Parkway in 1989, the FHWA established the temporary works research program. The program was guided by the Scaffolding, Shoring, and Forming Task Group as formed by the FHWA. The objective of the study has been to develop a guide design specification for use by State agencies to update their existing standard specifications for falsework, formwork, and related temporary construction. The guide specification was prepared in a format similar to the AASHTO Standard Specifications for Highway Bridge Structures.
Guide Design Specification for Bridge Temporary Works
Following the collapse of the Route 198 bridge over the Baltimore/Washington Parkway in 1989, the FHWA established the temporary works research program. The program was guided by the Scaffolding, Shoring, and Forming Task Group as formed by the FHWA. The objective of the study has been to develop a guide design specification for use by State agencies to update their existing standard specifications for falsework, formwork, and related temporary construction. The guide specification was prepared in a format similar to the AASHTO Standard Specifications for Highway Bridge Structures.
Guide Design Specification for Bridge Temporary Works
J. F. Duntemann (author) / L. E. Dunn (author) / S. Gill (author) / R. G. Lukas (author) / M. K. Kaler (author)
1993
90 pages
Report
No indication
English
FHWA's Bridge Temporary Works Research Program
British Library Conference Proceedings | 1995
|FHWA's Bridge Temporary Works Research Program
British Library Conference Proceedings | 1995
|Certification Program for Bridge Temporary Works
NTIS | 1993
Construction Handbook for Bridge Temporary Works
NTIS | 1993
|