A platform for research: civil engineering, architecture and urbanism
Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.
Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.
Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects
Hosteng T. (author) / Phares B. (author) / Abu-Hawash A. (author) / Bierwagen D. (author) / Nelson J. (author)
2015
51 pages
Report
No indication
English
Civil Engineering , Construction Equipment, Materials, & Supplies , Composite Materials , Construction Materials, Components, & Equipment , Accelerated bridge construction , Chloride penetration testing , Fatigue load testing , Grouted coupler connections , Key Creek Bridge , Precast concrete bridges , Static load testing
Grouted shear stud connection for steel bridge substructures
Online Contents | 2015
|Grouted sleeve coupler splice (GSCS) for precast concrete piles
European Patent Office | 2023
|Strengthening bridge slabs with grouted reinforcement
Engineering Index Backfile | 1949
|