A platform for research: civil engineering, architecture and urbanism
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is a prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is a prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)
National Dam Safety Program. Warren Mill Dam, (NJ00765) Delaware River Basin, Musconetcong River, Warren/Hunterdon Counties, New Jersey. Phase I Inspection Report
A. Perera (author)
1981
62 pages
Report
No indication
English