A platform for research: civil engineering, architecture and urbanism
The A39 motorway- 350,000 tonnes of cement-treated sand in three months
The A39 motorway- 350,000 tonnes of cement-treated sand in three months
The A39 motorway- 350,000 tonnes of cement-treated sand in three months
Bense, P. (author) / Hombert, M.
1997
Article (Journal)
French
The A39 motorway - 350,000 tonnes of cement-treated sand in three months
British Library Online Contents | 1997
|A 350,000-volt testing transformer
Engineering Index Backfile | 1922
|Caballo dam on Rio Grande to store 350,000 ac ft
Engineering Index Backfile | 1936
Running a 45-million-tonnes cement production capacity
British Library Online Contents | 2006
Placing 350,000 cubic yards of concrete in ariel dam
Engineering Index Backfile | 1931
|