FEATURE ARTICLES - Surviving a Mudslide: Bringing Cushman #2 Back To Life - On March 25, 1999, Tacoma Power's 81-MW Cushman #2 Project was inundated by 20,000 cubic yards of mud -- Enough mud to fill 2,000 dump trucks! Owing to an innovative repair team approach, a non-stop work schedule, and utility-wide cooperation, the plant was back in service in only 25 days.
FEATURE ARTICLES - Surviving a Mudslide: Bringing Cushman #2 Back To Life - On March 25, 1999, Tacoma Power's 81-MW Cushman #2 Project was inundated by 20,000 cubic yards of mud -- Enough mud to fill 2,000 dump trucks! Owing to an innovative repair team approach, a non-stop work schedule, and utility-wide cooperation, the plant was back in service in only 25 days.
FEATURE ARTICLES - Surviving a Mudslide: Bringing Cushman #2 Back To Life - On March 25, 1999, Tacoma Power's 81-MW Cushman #2 Project was inundated by 20,000 cubic yards of mud -- Enough mud to fill 2,000 dump trucks! Owing to an innovative repair team approach, a non-stop work schedule, and utility-wide cooperation, the plant was back in service in only 25 days.
Hahn, Sarah A. (author)
Hydro review ; 20
2001
Article (Journal)
English
Recovering From a 20,000 Cubic Yard Mudslide at Tacoma Power's Cushman #2 Powerhouse and Switchyard
British Library Conference Proceedings | 2000
|Surviving a Mudslide: Bringing Cushman #2 Back To Life
British Library Online Contents | 2001
|Cushman hydroelectric project for Tacoma
Engineering Index Backfile | 1928
|Cushman power plant no. 2 for tacoma
Engineering Index Backfile | 1930
The cushman hydroelectric development
Engineering Index Backfile | 1927
|