A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION - A stable environment - MAI self drilling anchors were used to stabilise the desilting chamber walls at the Tala project in Bhutan
CONSTRUCTION - A stable environment - MAI self drilling anchors were used to stabilise the desilting chamber walls at the Tala project in Bhutan
CONSTRUCTION - A stable environment - MAI self drilling anchors were used to stabilise the desilting chamber walls at the Tala project in Bhutan
2005
Article (Journal)
English
Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
British Library Conference Proceedings | 2000
|1020 MW Tala Hydroelectric Project (Bhutan) - A Fast Track Construction Model
British Library Conference Proceedings | 2000
|HYDRAULIC MODEL STUDIES FOR TALA DAM SPILLWAY, BHUTAN
Taylor & Francis Verlag | 2005
|HYDRAULIC MODEL STUDIES FOR TALA DAM SPILLWAY, BHUTAN
Taylor & Francis Verlag | 2005
|Control of alkali silica reaction at Tala Hydroelectric Project in Bhutan
British Library Conference Proceedings | 2006
|