A platform for research: civil engineering, architecture and urbanism
Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
Construction Methodology for Desilting Caverns of 1020 MW Tala Hydroelectric Project, Western Bhutan
Turki, S. K. (author) / Rajora, V. K. (author) / Kaushish, S. P. / Ramamurthy, T. / International Tunnelling Association / India
International conference, Tunnelling Asia '2000; need for accelerated underground construction, issues and challenges ; 2000 ; New Delhi
2000-01-01
10 pages
Includes bibliographical references and index
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
1020 MW Tala Hydroelectric Project (Bhutan) - A Fast Track Construction Model
British Library Conference Proceedings | 2000
|British Library Conference Proceedings | 2001
|Control of alkali silica reaction at Tala Hydroelectric Project in Bhutan
British Library Conference Proceedings | 2006
|Quality Management of Power House Cavern at Tala Hydroelectric Project in Bhutan, Himalayas
British Library Conference Proceedings | 2003
|