A platform for research: civil engineering, architecture and urbanism
SPECIAL REPORT: Seven Mile Dam and Generating Station - By bringing a fourth turbine-generator on line at its 804-MW Seven Mile Dam and Generating Station, BC Hydro can provide electricity to 30,000 more homes each year. The project also helped the utility achieve its goal of increasing efficiency and capacity at existing plants.
SPECIAL REPORT: Seven Mile Dam and Generating Station - By bringing a fourth turbine-generator on line at its 804-MW Seven Mile Dam and Generating Station, BC Hydro can provide electricity to 30,000 more homes each year. The project also helped the utility achieve its goal of increasing efficiency and capacity at existing plants.
SPECIAL REPORT: Seven Mile Dam and Generating Station - By bringing a fourth turbine-generator on line at its 804-MW Seven Mile Dam and Generating Station, BC Hydro can provide electricity to 30,000 more homes each year. The project also helped the utility achieve its goal of increasing efficiency and capacity at existing plants.
Hydro review ; 23
2004
Article (Journal)
English
SPECIAL REPORT: Seven Mile Dam and Generating Station - Installing a Fourth Generating Unit
Online Contents | 2004
|SPECIAL REPORT: Seven Mile Dam and Generating Station - Performing Unusual Draft Tube Modifications
Online Contents | 2004
|SPECIAL REPORT: Seven Mile Dam and Generating Station - Using Anchors to Improve Stability
Online Contents | 2004
|Engineering Index Backfile | 1929
|The seven-mile (Nanango) goldfield
Engineering Index Backfile | 1906
|