A platform for research: civil engineering, architecture and urbanism
Integral Lifting of a Three-Span Continuous Beam Bridge
AbstractA three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
Integral Lifting of a Three-Span Continuous Beam Bridge
AbstractA three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
Integral Lifting of a Three-Span Continuous Beam Bridge
Zhou, Jian (author) / Xu, Changjie / Xu, Lige
2015
Article (Journal)
English
Integral Lifting of a Three-Span Continuous Beam Bridge
ASCE | 2014
|Integral Lifting of a Three-Span Continuous Beam Bridge
British Library Online Contents | 2015
|European Patent Office | 2024
|Dynamic tests of three-span continuous I-beam highway bridge
Engineering Index Backfile | 1961
|Railway long-span bridge beam end telescopic sleeper lifting device
European Patent Office | 2023
|