A platform for research: civil engineering, architecture and urbanism
Optimized Group Replacement Scheduling for Water Pipeline Network
AbstractReplacement of deteriorated water pipes is a capital-intensive activity for utility companies. Replacement planning aims to minimize total costs while maintaining a satisfactory level of service and is usually conducted for individual pipes. Scheduling replacement in groups is seen to be a better method and has the potential to provide benefits such as the reduction of maintenance costs and service interruptions. However, developing group replacement schedules is a complex task and often beyond the ability of a human expert, especially when multiple or conflicting objectives need to be catered for, such as minimization of total costs and service interruptions. This paper describes the development of a novel replacement decision optimization model for group scheduling (RDOM-GS), which enables multiple group-scheduling criteria by integrating new cost functions, a service interruption model, and optimization algorithms into a unified procedure. An industry case study demonstrates that RDOM-GS can improve replacement planning significantly and reduce costs and service interruptions.
Optimized Group Replacement Scheduling for Water Pipeline Network
AbstractReplacement of deteriorated water pipes is a capital-intensive activity for utility companies. Replacement planning aims to minimize total costs while maintaining a satisfactory level of service and is usually conducted for individual pipes. Scheduling replacement in groups is seen to be a better method and has the potential to provide benefits such as the reduction of maintenance costs and service interruptions. However, developing group replacement schedules is a complex task and often beyond the ability of a human expert, especially when multiple or conflicting objectives need to be catered for, such as minimization of total costs and service interruptions. This paper describes the development of a novel replacement decision optimization model for group scheduling (RDOM-GS), which enables multiple group-scheduling criteria by integrating new cost functions, a service interruption model, and optimization algorithms into a unified procedure. An industry case study demonstrates that RDOM-GS can improve replacement planning significantly and reduce costs and service interruptions.
Optimized Group Replacement Scheduling for Water Pipeline Network
Ma, Lin (author) / Sun, Yong / Mathew, Joseph / Li, Fengfeng
2016
Article (Journal)
English
Optimized Group Replacement Scheduling for Water Pipeline Network
British Library Online Contents | 2016
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
British Library Online Contents | 2010
|Optimal Scheduling of Replacement and Rehabilitation in Wastewater Pipeline Networks
Online Contents | 2010
|Criteria for Pipeline Replacement
Wiley | 1978
|