A platform for research: civil engineering, architecture and urbanism
Amulsar gold project moves ahead
Lydian International Ltd. recently announced that construction at the company's 100% owned Amulsar gold project is proceeding as planned. As of May 31, project commitments totaled $213 million. Infrastructure construction power and water are in place, access roads are complete, the construction warehouse has been erected, and detailed design and fabrication of the electrical distribution equipment are in process. Renovations to a local 250-bed hotel used for initial worker accommodations are complete and the 680--bed permanent residence camp is expected to be comoleted and occunied this summer.
Amulsar gold project moves ahead
Lydian International Ltd. recently announced that construction at the company's 100% owned Amulsar gold project is proceeding as planned. As of May 31, project commitments totaled $213 million. Infrastructure construction power and water are in place, access roads are complete, the construction warehouse has been erected, and detailed design and fabrication of the electrical distribution equipment are in process. Renovations to a local 250-bed hotel used for initial worker accommodations are complete and the 680--bed permanent residence camp is expected to be comoleted and occunied this summer.
Amulsar gold project moves ahead
2017
Article (Journal)
English
Online Contents | 1996
|Natuna LNG Project Moves Ahead
Online Contents | 1994
Desalting Technology Moves Ahead
Tema Archive | 1972
|News - Amsterdam's 10-year immersed tube tunnel project moves ahead
Online Contents | 2011
IuD Bahn | 2007
|