Construction of the Bennett hydro development
Conclusion It is of greatest interest and benefit to us to study the experience of organizing the construction of the earth dam, where 46 million $ m^{3} $ of soil were transported from a borrow pit located 6.5 km from the site by the most economical method — by conveyers at a rate up to 5500 $ m^{3} $/h, which permitted constructing the entire dam in the shortest possible time (from July 1964 to September 1967), i.e., practically during 3 1/2 construction seasons.
Construction of the Bennett hydro development
Conclusion It is of greatest interest and benefit to us to study the experience of organizing the construction of the earth dam, where 46 million $ m^{3} $ of soil were transported from a borrow pit located 6.5 km from the site by the most economical method — by conveyers at a rate up to 5500 $ m^{3} $/h, which permitted constructing the entire dam in the shortest possible time (from July 1964 to September 1967), i.e., practically during 3 1/2 construction seasons.
Construction of the Bennett hydro development
Mal'tsev, N. D. (author) / Minaev, E. V. (author) / Moiseev, I. S. (author) / Protsenko, D. F. (author)
1974
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Construction of the Bennett hydro development
Springer Verlag | 1974
|Construction Driven Design - Bennett Brook Bridge
British Library Conference Proceedings | 1997
|Online Contents | 2000
Design and Construction of William R. Bennett Bridge
British Library Conference Proceedings | 2008
|