A platform for research: civil engineering, architecture and urbanism
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Conclusion The scheme developed for operating high-head segmented gates on eccentric supports by means of temporary installations, as has been highly recommended, may also be employed on other construction projects in similar situations.
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Conclusion The scheme developed for operating high-head segmented gates on eccentric supports by means of temporary installations, as has been highly recommended, may also be employed on other construction projects in similar situations.
Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Sevenard, Yu. K. (author) / Nikolaev, B. A. (author) / Redchenko, I. S. (author) / Svintsov, F. F. (author) / Chobanis, Ya. G. (author) / Chernovol, N. A. (author)
1979
Article (Journal)
English
BKL:
56.30
Wasserbau
Local classification TIB:
770/6550/8000
Nurek hydroelectric development on the Vakhsh River
Springer Verlag | 1969
|Passing Vakhsh river flows during construction of the Nurek hydroelectric plant
Springer Verlag | 1979
|Construction of the Nurek hydroelectric station penstocks
Springer Verlag | 1972
|