A platform for research: civil engineering, architecture and urbanism
Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Abstract Experience of operation of tubular air heaters (TAH) on twelve boilers of type PK-38 for 150-MW power units of the Berezovskaya GRÉS (state regional power plant) in Belarus is presented. Coal-fired, gas-fired, and oil-fired operation modes with updating tubular air heaters in a cascade layout are described. Advantages of the cascade layout and conditions for reliable, efficient, and long-term service of the TAH are shown.
Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Abstract Experience of operation of tubular air heaters (TAH) on twelve boilers of type PK-38 for 150-MW power units of the Berezovskaya GRÉS (state regional power plant) in Belarus is presented. Coal-fired, gas-fired, and oil-fired operation modes with updating tubular air heaters in a cascade layout are described. Advantages of the cascade layout and conditions for reliable, efficient, and long-term service of the TAH are shown.
Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Shchelokov, V. I. (author) / Smyshlyaev, A. A. (author) / Lafa, Yu. I. (author) / Serik, V. I. (author)
2004
Article (Journal)
English
air bypassing , dew point , air heater , tube , temperature , boiler , section
Results of long-term operation of cascade tubular air heaters at the berezovskaya grés
Springer Verlag | 2004
|Results of long-term operation of cascade tubular air heaters at the Berezovskaya GRÉS
Springer Verlag | 2004
|Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Online Contents | 2017
|Specific Operating Conditions of the K-175-12,7 Steam Turbine of Unit 5 at the Berezovskaya Grés
Online Contents | 2017
|British Library Online Contents | 1992