A platform for research: civil engineering, architecture and urbanism
Prediction of electric-power generation at hydroelectric power plants
The purpose of this study is to select and test models for prediction of electric-power generation at the Rybinsk and Nizhegorodskaya HPP with allowance for their cascade operation for the second quarter based on data (runoff-forming and atmospheric factors), which are known at the time of the prediction.
Prediction of electric-power generation at hydroelectric power plants
The purpose of this study is to select and test models for prediction of electric-power generation at the Rybinsk and Nizhegorodskaya HPP with allowance for their cascade operation for the second quarter based on data (runoff-forming and atmospheric factors), which are known at the time of the prediction.
Prediction of electric-power generation at hydroelectric power plants
Aleksandrovskii, A. Yu. (author) / Borshch, P. S. (author)
2013
Article (Journal)
Electronic Resource
English
BKL:
56.30
Wasserbau
/
56.30$jWasserbau
Prediction of electric-power generation at hydroelectric power plants
Online Contents | 2013
|Prediction of electric-power generation at hydroelectric power plants
Springer Verlag | 2013
|Modern Hydroelectric Power Plants
Engineering Index Backfile | 1930
|Bibliography: Underground hydroelectric power plants
Engineering Index Backfile | 1956
|Vibration in Hydroelectric Power Plants
ASCE | 2021
|