A platform for research: civil engineering, architecture and urbanism
A New Numerical Simulation Method for Multi-stage in-Fracture Temporary Plugging and Diverting Fracturing: Based on the Modified Cohesive Zone Model
A New Numerical Simulation Method for Multi-stage in-Fracture Temporary Plugging and Diverting Fracturing: Based on the Modified Cohesive Zone Model
A New Numerical Simulation Method for Multi-stage in-Fracture Temporary Plugging and Diverting Fracturing: Based on the Modified Cohesive Zone Model
Rock Mech Rock Eng
Huang, Guopeng (author) / Li, Minghui (author) / Zhou, Fujian (author) / Chu, Jinqi (author) / Xiong, Zhuang (author)
Rock Mechanics and Rock Engineering ; 57 ; 8723-8740
2024-10-01
Article (Journal)
Electronic Resource
English
Quantitative Investigation of Fracture Apertures during Temporary Plugging and Diverting Fracturing
DOAJ | 2023
|European Patent Office | 2023
|Temporary plugging gate and temporary plugging method of sewage pipeline
European Patent Office | 2020
|Temporary plugging device for reserved hole and use method of temporary plugging device
European Patent Office | 2024
|