A risk-oriented buffer allocation model based on critical chain project management
Abstract In this study, a multi-attribute buffer sizing method is proposed aimed at maximizing the robustness of the buffered schedule generated. The project attributes concerning the network complexity, flexibility criteria, criticality index and robustness measures are considered through the buffer sizing process. The methodology presented is based on the critical chain buffer management methodology, yet innovative metrics are presented to deal with the uncertainties associated with the critical and non-critical chains. The buffer sizing method proposed eliminates the previous limitations and attempts to economically determine the size of the feeding and project buffers. Additionally, a risk analysis is performed to examine the effects of external factors on buffer sizes. The weaknesses of the existing buffer sizing approaches were overcome in the critical chain project management, and a novel buffer sizing method was established based on internal and external risk aspects. A simulation experiment is conducted in order to prove the effectiveness of the method proposed. The computational results of implementing the method on a real case study specify that the method proposed generates more stable project plans at a lower cost, compared with those generated using traditional buffer sizing methods.
A risk-oriented buffer allocation model based on critical chain project management
Abstract In this study, a multi-attribute buffer sizing method is proposed aimed at maximizing the robustness of the buffered schedule generated. The project attributes concerning the network complexity, flexibility criteria, criticality index and robustness measures are considered through the buffer sizing process. The methodology presented is based on the critical chain buffer management methodology, yet innovative metrics are presented to deal with the uncertainties associated with the critical and non-critical chains. The buffer sizing method proposed eliminates the previous limitations and attempts to economically determine the size of the feeding and project buffers. Additionally, a risk analysis is performed to examine the effects of external factors on buffer sizes. The weaknesses of the existing buffer sizing approaches were overcome in the critical chain project management, and a novel buffer sizing method was established based on internal and external risk aspects. A simulation experiment is conducted in order to prove the effectiveness of the method proposed. The computational results of implementing the method on a real case study specify that the method proposed generates more stable project plans at a lower cost, compared with those generated using traditional buffer sizing methods.
A risk-oriented buffer allocation model based on critical chain project management
Ghoddousi, Parviz (author) / Ansari, Ramin (author) / Makui, Ahmad (author)
KSCE Journal of Civil Engineering ; 21 ; 1536-1548
2016-09-02
13 pages
Article (Journal)
Electronic Resource
English
A risk-oriented buffer allocation model based on critical chain project management
Online Contents | 2017
|Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy
DOAJ | 2022
|Buffer Sizing in Construction Scheduling Using Critical Chain Project Management
Springer Verlag | 2022
|Applying critical chain buffer management theory in location-based management
Online Contents | 2014
|Applying critical chain buffer management theory in location-based management
Taylor & Francis Verlag | 2014
|