Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy
In order to solve the problems such as project duration delay caused by unreasonable buffer zone setting, a critical chain buffer zone setting method is proposed based on fragility theory. Firstly, we propose that the construction process is brittle and the brittleness of the construction process was analyzed. Secondly, this paper introduces a risk-integrated impact rate to describe the uncertainty of the construction process and establishes a brittle risk entropy function. Then, it presents entropy models and modification models of project buffers and feeding buffers based on the original Root Square Error Method. Finally, an engineering project was selected as an example, and the simulation was carried out using the Monte Carlo simulation software Crystal Ball, and the resulting method was compared with three buffer zone calculation methods. The results show that the method can effectively reduce the construction period and is effective and practical when compared to the other three buffer calculation methods. The results of the study provide a new way of thinking about buffer settings based on existing critical chain project management methods.
Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy
In order to solve the problems such as project duration delay caused by unreasonable buffer zone setting, a critical chain buffer zone setting method is proposed based on fragility theory. Firstly, we propose that the construction process is brittle and the brittleness of the construction process was analyzed. Secondly, this paper introduces a risk-integrated impact rate to describe the uncertainty of the construction process and establishes a brittle risk entropy function. Then, it presents entropy models and modification models of project buffers and feeding buffers based on the original Root Square Error Method. Finally, an engineering project was selected as an example, and the simulation was carried out using the Monte Carlo simulation software Crystal Ball, and the resulting method was compared with three buffer zone calculation methods. The results show that the method can effectively reduce the construction period and is effective and practical when compared to the other three buffer calculation methods. The results of the study provide a new way of thinking about buffer settings based on existing critical chain project management methods.
Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy
Jun-long Peng (author) / Chao Peng (author)
2022
Article (Journal)
Electronic Resource
Unknown
Metadata by DOAJ is licensed under CC BY-SA 1.0
Buffer Sizing in Construction Scheduling Using Critical Chain Project Management
Springer Verlag | 2022
|Data-driven project buffer sizing in critical chains
Elsevier | 2022
|A risk-oriented buffer allocation model based on critical chain project management
Springer Verlag | 2016
|A risk-oriented buffer allocation model based on critical chain project management
Online Contents | 2017
|Project buffer sizing and dynamic buffer consumption algorithm in power generation construction
Emerald Group Publishing | 2021
|