A platform for research: civil engineering, architecture and urbanism
Construction, Inspection and Acceptance, Maintenance and Dismantling
This chapter describes the fabrication and erection of steel tubes, the placement of core concrete and concrete encasement, and the inspection, acceptance, maintenance and dismantling of CFST structures.
Construction, Inspection and Acceptance, Maintenance and Dismantling
This chapter describes the fabrication and erection of steel tubes, the placement of core concrete and concrete encasement, and the inspection, acceptance, maintenance and dismantling of CFST structures.
Construction, Inspection and Acceptance, Maintenance and Dismantling
Han, Lin-Hai (author)
Theory of Concrete-Filled Steel Tubular Structures ; Chapter: 8 ; 339-353
2023-10-20
15 pages
Article/Chapter (Book)
Electronic Resource
English
Building construction formwork dismantling method and dismantling device
European Patent Office | 2023
|Early-dismantling vertical rod, early-dismantling system and construction method
European Patent Office | 2024
|Dismantling device and dismantling method for bent cap construction platform
European Patent Office | 2022
|Large-span bridge construction acceptance inspection device
European Patent Office | 2024
|