A platform for research: civil engineering, architecture and urbanism
Early-dismantling vertical rod, early-dismantling system and construction method
The invention discloses an early-dismantling vertical rod, an early-dismantling system and a construction method, and belongs to the technical field of building construction equipment.The early-dismantling vertical rod comprises a top tray, a rod body, a positioning device, a safety device and an adjustable device; the rod body comprises a first rod body and a second rod body; one end of the first rod body is connected with one end of the adjustable device; one end of the second rod body is detachably connected with the other end of the adjustable device, and the second rod body is located below the first rod body; the top tray is positioned at the other end of the first rod body; the positioning device is arranged on the first rod body; the safety device is mounted on the first rod body below the positioning device; the adjustable device is used for adjusting the distance between the first rod body and the second rod body. The early-dismantling system at least comprises an upper-layer cross rod, a lower-layer cross rod and two early-dismantling vertical rods. The invention further discloses a construction method of the early dismantling system. The safety device is in a safety state and a limiting state, the early dismounting function is achieved, the height requirement of a room is met, the standard floor is achieved that one rod reaches the top, and mounting, dismounting and carrying are convenient.
本发明公开了一种早拆立杆、早拆体系及施工工法,属于建筑施工设备技术领域,早拆立杆包括:顶盘、杆体、定位装置、保险装置和可调装置;杆体包括:第一杆体和第二杆体;第一杆体的一端与可调装置的一端连接;第二杆体的一端与可调装置的另一端可拆卸连接,第二杆体位于第一杆体的下方;顶盘位于第一杆体的另一端;定位装置设置在第一杆体上;保险装置安装在定位装置下方的第一杆体上;可调装置用于调节第一杆体与第二杆体之间的距离。早拆体系至少包括:上下两层横杆和两根如上的早拆立杆。一种如上的早拆体系的施工工法。使保险装置处于保险状态和限位状态,实现了早拆功能,满足房间高度要求,实现标准层一杆到顶,便于安装、拆卸和搬运。
Early-dismantling vertical rod, early-dismantling system and construction method
The invention discloses an early-dismantling vertical rod, an early-dismantling system and a construction method, and belongs to the technical field of building construction equipment.The early-dismantling vertical rod comprises a top tray, a rod body, a positioning device, a safety device and an adjustable device; the rod body comprises a first rod body and a second rod body; one end of the first rod body is connected with one end of the adjustable device; one end of the second rod body is detachably connected with the other end of the adjustable device, and the second rod body is located below the first rod body; the top tray is positioned at the other end of the first rod body; the positioning device is arranged on the first rod body; the safety device is mounted on the first rod body below the positioning device; the adjustable device is used for adjusting the distance between the first rod body and the second rod body. The early-dismantling system at least comprises an upper-layer cross rod, a lower-layer cross rod and two early-dismantling vertical rods. The invention further discloses a construction method of the early dismantling system. The safety device is in a safety state and a limiting state, the early dismounting function is achieved, the height requirement of a room is met, the standard floor is achieved that one rod reaches the top, and mounting, dismounting and carrying are convenient.
本发明公开了一种早拆立杆、早拆体系及施工工法,属于建筑施工设备技术领域,早拆立杆包括:顶盘、杆体、定位装置、保险装置和可调装置;杆体包括:第一杆体和第二杆体;第一杆体的一端与可调装置的一端连接;第二杆体的一端与可调装置的另一端可拆卸连接,第二杆体位于第一杆体的下方;顶盘位于第一杆体的另一端;定位装置设置在第一杆体上;保险装置安装在定位装置下方的第一杆体上;可调装置用于调节第一杆体与第二杆体之间的距离。早拆体系至少包括:上下两层横杆和两根如上的早拆立杆。一种如上的早拆体系的施工工法。使保险装置处于保险状态和限位状态,实现了早拆功能,满足房间高度要求,实现标准层一杆到顶,便于安装、拆卸和搬运。
Early-dismantling vertical rod, early-dismantling system and construction method
一种早拆立杆、早拆体系及施工工法
CAO LIYING (author)
2024-04-16
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|European Patent Office | 2022
|European Patent Office | 2023
|