A platform for research: civil engineering, architecture and urbanism
A case study on crack propagation law of cement stabilised macadam base
Based on the indoor crack monitoring test, the feasibility of monitoring base crack with sensing optical fibre and the appropriate optical fibre category are studied in detail. Through the field monitoring test of cement stabilised macadam, the crack development law in the early stage of cement stabilised base layer was researched. The test results show that the proposed sensing fibre can be used in researching the crack development law of cement stabilised macadam base. The initiation of crack in cement stabilised macadam base occurs mainly in the first 3 days after construction, in which the dry shrinkage crack is dominant. The development of the dry shrinkage probably ended in about 30 days. The dry shrinkage stress is the main factor of crack initiation and crack spacing. The influence of thermal stress on early crack spacing is very weak, and the thermal stress strongly affects the crack width. The thermal cracks basically appear in the location where the dry shrinkage stress displays peaks during the dry shrinkage phase. When the subbase and base layers were constructed continuously, the transverse cracks in cement stabilised macadam are always penetrating cracks.
A case study on crack propagation law of cement stabilised macadam base
Based on the indoor crack monitoring test, the feasibility of monitoring base crack with sensing optical fibre and the appropriate optical fibre category are studied in detail. Through the field monitoring test of cement stabilised macadam, the crack development law in the early stage of cement stabilised base layer was researched. The test results show that the proposed sensing fibre can be used in researching the crack development law of cement stabilised macadam base. The initiation of crack in cement stabilised macadam base occurs mainly in the first 3 days after construction, in which the dry shrinkage crack is dominant. The development of the dry shrinkage probably ended in about 30 days. The dry shrinkage stress is the main factor of crack initiation and crack spacing. The influence of thermal stress on early crack spacing is very weak, and the thermal stress strongly affects the crack width. The thermal cracks basically appear in the location where the dry shrinkage stress displays peaks during the dry shrinkage phase. When the subbase and base layers were constructed continuously, the transverse cracks in cement stabilised macadam are always penetrating cracks.
A case study on crack propagation law of cement stabilised macadam base
Gao, Junqi (author) / Jin, Peipei (author) / Sheng, Yuxiang (author) / An, Ping (author)
International Journal of Pavement Engineering ; 21 ; 516-523
2020-03-20
8 pages
Article (Journal)
Electronic Resource
English
Remixing regenerated cement stabilized macadam base material and cement stabilized macadam base
European Patent Office | 2023
|Anti-crack rubber powder fiber cement stabilized macadam base material
European Patent Office | 2024
|Mechanical properties and durability of cement-stabilised macadam incorporating waste foundry sand
Taylor & Francis Verlag | 2023
|