Installation of detroit edison gas insulated substations
This paper discusses the installation of three Detroit Edison 120 kV gas insulated substations - Caniff, Midtown and Cato. These substations, all located in Detroit, were installed between October 1972 and June 1973. Discussion topics include the shipment, foundation, assembly and wiring of metal enclosed components, SF6 gas processing and high voltage field testing.
Installation of detroit edison gas insulated substations
This paper discusses the installation of three Detroit Edison 120 kV gas insulated substations - Caniff, Midtown and Cato. These substations, all located in Detroit, were installed between October 1972 and June 1973. Discussion topics include the shipment, foundation, assembly and wiring of metal enclosed components, SF6 gas processing and high voltage field testing.
Installation of detroit edison gas insulated substations
Bau und Montage von gasisolierten Unterstationen der Detroit Edison
Hathaway, G.H. (author) / Sparks, W.W. (author)
IEEE Transactions on Power Apparatus and Systems ; 94 ; 1608-1617
1975
10 Seiten, 22 Bilder, 2 Tabellen, 1 Quelle
Article (Journal)
English
Three and one-half years experience of the Detroit Edison company in concrete control
Engineering Index Backfile | 1929
Reliability of Gas Insulated Substations and Switchgears with Traditional Insulation
Online Contents | 2003
|Reliability of Gas Insulated Substations and Switchgears with Traditional Insulation
Springer Verlag | 2003
|Seismic Base Isolation of Gas Insulated Electrical Substations: Comparison Among Different Solutions
British Library Conference Proceedings | 1995
|