A platform for research: civil engineering, architecture and urbanism
Three and one-half years experience of the Detroit Edison company in concrete control
Detroit Edison Co. in field laboratory has proportioned and controlled all its concrete according to best practice which it was possible to determine; aggregates; first control job; equipment; analysis of costs; variation in consistency; low cement content; description of new Delray power plant No. 3; durability; winter methods; advantages of control.
Three and one-half years experience of the Detroit Edison company in concrete control
Detroit Edison Co. in field laboratory has proportioned and controlled all its concrete according to best practice which it was possible to determine; aggregates; first control job; equipment; analysis of costs; variation in consistency; low cement content; description of new Delray power plant No. 3; durability; winter methods; advantages of control.
Three and one-half years experience of the Detroit Edison company in concrete control
Am. Concrete Inst. -- Advance paper
American Concrete Institute -- Meeting ; 1929
1929
52 pages
36 Figs.
Conference Proceedings
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Installation of detroit edison gas insulated substations
Tema Archive | 1975
|Engineering Index Backfile | 1908
|Unlined tunnels of southern California Edison Company
Engineering Index Backfile | 1963
|Reinforced concrete in the Edison fire
Engineering Index Backfile | 1915
|