A platform for research: civil engineering, architecture and urbanism
Describes the extensive Kings Cross area resignalling scheme completed in 1977. The scheme was started in 1971 and right from the beginning was planned as part of the 25 kV electrification of Great Northern line inner- and outer-suburban services, which involved extensive rationalisation and re-routeing of suburban traffic flows, together with a complex programme of civil engineering works, including complete rebuilding of the track layout at Kings Cross station and its approaches.
Describes the extensive Kings Cross area resignalling scheme completed in 1977. The scheme was started in 1971 and right from the beginning was planned as part of the 25 kV electrification of Great Northern line inner- and outer-suburban services, which involved extensive rationalisation and re-routeing of suburban traffic flows, together with a complex programme of civil engineering works, including complete rebuilding of the track layout at Kings Cross station and its approaches.
Kings Cross area resignalling
Moderne Signalausruestung des Bahnhofs Kings Cross
Kichenside, G.M. (author)
Modern Railways ; 35 ; 157-161
1978
5 Seiten
Article (Journal)
English
A modular approach to resignalling
IuD Bahn | 2011
|Metropolitan resignalling problems
Online Contents | 2014
Resignalling the Cherwell Valley
Online Contents | 2004
Online Contents | 2014
Online Contents | 2002