Cleveland Harbor, Ohio Interim Dredge Disposal Plan: Geotextile Reinforcement of Placed Dredge Fill
The available capacities of the Cleveland Harbor confined disposal facilities (CDFs) are reaching the point where hydraulic placement of dredged material is no longer feasible and will reach the minimum 2 foot containment free-board by the end of 2014. A new disposal facility will not be available until at least 2018. Therefore, in order to provide interim dredge material disposal capacity from 2015 - 2018 the existing CDFs will require dredged material to be stacked in the facilities above the original containment dike crest height. Imposed loading from the stacked dredged fill has raised some global stability concerns. A number of alternative stabilization schemes were investigated including the use of geotextile reinforcement in combination with wick drains. This presentation/paper discusses the results of the engineering analysis performed using geotextile reinforcement as part of a stabilization method.
Cleveland Harbor, Ohio Interim Dredge Disposal Plan: Geotextile Reinforcement of Placed Dredge Fill
The available capacities of the Cleveland Harbor confined disposal facilities (CDFs) are reaching the point where hydraulic placement of dredged material is no longer feasible and will reach the minimum 2 foot containment free-board by the end of 2014. A new disposal facility will not be available until at least 2018. Therefore, in order to provide interim dredge material disposal capacity from 2015 - 2018 the existing CDFs will require dredged material to be stacked in the facilities above the original containment dike crest height. Imposed loading from the stacked dredged fill has raised some global stability concerns. A number of alternative stabilization schemes were investigated including the use of geotextile reinforcement in combination with wick drains. This presentation/paper discusses the results of the engineering analysis performed using geotextile reinforcement as part of a stabilization method.
Cleveland Harbor, Ohio Interim Dredge Disposal Plan: Geotextile Reinforcement of Placed Dredge Fill
Lenhardt, Eugene N. (author)
2013
10 Seiten, Bilder
Conference paper
Storage medium
English
British Library Conference Proceedings | 2017
|Bucket and suction harbor dredge
Engineering Index Backfile | 1900
Engineering Index Backfile | 1924
Dredge fill for scenic freeway