A platform for research: civil engineering, architecture and urbanism
Research of a New Form Traveler on Cable-Stayed Bridge
The second Penang Bridge is a new bridge under construction in Penang, and will become the longest bridge in Malaysia and Southeast Asia. The purpose of this test is to estimate the bearing capacity of the form travelers in the second Penang Bridge. The pre-loading test simulates the construction stage of the typical edge beam and slab section. By observing the strain and deformation data of the form travelers, stress and displacement were analyzed to ascertain the performance and safety of form travelers and to provide evidence for the main beam alignment control in construction.
Research of a New Form Traveler on Cable-Stayed Bridge
The second Penang Bridge is a new bridge under construction in Penang, and will become the longest bridge in Malaysia and Southeast Asia. The purpose of this test is to estimate the bearing capacity of the form travelers in the second Penang Bridge. The pre-loading test simulates the construction stage of the typical edge beam and slab section. By observing the strain and deformation data of the form travelers, stress and displacement were analyzed to ascertain the performance and safety of form travelers and to provide evidence for the main beam alignment control in construction.
Research of a New Form Traveler on Cable-Stayed Bridge
Applied Mechanics and Materials ; 333-335 ; 2119-2122
2013-07-15
4 pages
Article (Journal)
Electronic Resource
English
UNDER LAUNCHING FORM TRAVELER AND CABLE BRIDGE CONSTRUCTION METHOD
European Patent Office | 2018
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
European Patent Office | 2020
|