A platform for research: civil engineering, architecture and urbanism
Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
Based on the underground Hongtudi station of Chongqing Rail Transit Line VI, stress and plastic strain of surrounding rock, internal forces of supporting structure and vault settlement are calculated in different widths of core pillar. Comprehensive analyses indicate that there is an optimal value of core pillar width in the construction of tunnel with the double-side heading method. Width of core pillar, 0.3 times as large as the tunnel span, is suggested in other projects with the same construction method, which is of great significance in practices.
Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
Based on the underground Hongtudi station of Chongqing Rail Transit Line VI, stress and plastic strain of surrounding rock, internal forces of supporting structure and vault settlement are calculated in different widths of core pillar. Comprehensive analyses indicate that there is an optimal value of core pillar width in the construction of tunnel with the double-side heading method. Width of core pillar, 0.3 times as large as the tunnel span, is suggested in other projects with the same construction method, which is of great significance in practices.
Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
Advanced Materials Research ; 261-263 ; 1882-1885
2011-05-31
4 pages
Article (Journal)
Electronic Resource
English
Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
British Library Conference Proceedings | 2011
|Method for optimizing double-side-wall pilot tunnel of ultra-large-span tunnel
European Patent Office | 2024
|Springer Verlag | 2024
|