A platform for research: civil engineering, architecture and urbanism
Research on retaining the middle heading and spraying steel fiber concrete support method for large-span bifurcated tunnel
In order to solve the problem of surrounding rock deformation during the construction of large-span bifurcated tunnels, this article takes the Yangang East Interchange project as the engineering background, and combines with the existing construction design scheme of large-span bifurcated tunnels, establishes a construction method of retaining the middle heading and spraying steel fiber concrete. Firstly, the construction process of retaining the steel fiber reinforced concrete construction method for the middle guide pit was provided. Then, numerical models of B and C bifurcation tunnels were established based on universal finite element software. From the perspective of surrounding rock deformation, the advantages of this project’s construction method over the original design construction method were analyzed. Research has shown that the construction method proposed in this article not only significantly controls arch crown settlement and inverted arch uplift, but also improves construction efficiency. This study can provide reference for the construction of urban bifurcated tunnels.
Research on retaining the middle heading and spraying steel fiber concrete support method for large-span bifurcated tunnel
In order to solve the problem of surrounding rock deformation during the construction of large-span bifurcated tunnels, this article takes the Yangang East Interchange project as the engineering background, and combines with the existing construction design scheme of large-span bifurcated tunnels, establishes a construction method of retaining the middle heading and spraying steel fiber concrete. Firstly, the construction process of retaining the steel fiber reinforced concrete construction method for the middle guide pit was provided. Then, numerical models of B and C bifurcation tunnels were established based on universal finite element software. From the perspective of surrounding rock deformation, the advantages of this project’s construction method over the original design construction method were analyzed. Research has shown that the construction method proposed in this article not only significantly controls arch crown settlement and inverted arch uplift, but also improves construction efficiency. This study can provide reference for the construction of urban bifurcated tunnels.
Research on retaining the middle heading and spraying steel fiber concrete support method for large-span bifurcated tunnel
Atlantis Highlights in Engineering
Zhao, Gaofeng (editor) / Mei, Guoxiong (editor) / Xu, Zengguang (editor) / Zhang, Fei (editor) / Du, Xiurong (author) / Chen, Chao (author)
International Conference on Civil Architecture and Urban Engineering ; 2023 ; Xiamen, China
2024-02-11
13 pages
Article/Chapter (Book)
Electronic Resource
English
Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
Trans Tech Publications | 2011
|Study on Optimization of Core Pillar in Large-Span Tunnel Excavated with Double-Side Heading Method
British Library Conference Proceedings | 2011
|Large-span corrugated steel-concrete composite structure shed tunnel and construction method thereof
European Patent Office | 2024
|Large-span arc-shaped steel structure without support in middle and construction method
European Patent Office | 2024
|Large-span arc-shaped steel structure without support in middle and construction method
European Patent Office | 2021
|