A platform for research: civil engineering, architecture and urbanism
Analysis of the Working Characteristics of High-Pile Wharf Pile Foundation under Berthing Load
In order to study the working characteristics of high-pile wharf pile foundation under berthing load, our team conducted the field test and established the numerical models. Analyzing the data from the test and models, the relationship between load and displacement of piles was deduced primarily. It’s proven to be usability.
Analysis of the Working Characteristics of High-Pile Wharf Pile Foundation under Berthing Load
In order to study the working characteristics of high-pile wharf pile foundation under berthing load, our team conducted the field test and established the numerical models. Analyzing the data from the test and models, the relationship between load and displacement of piles was deduced primarily. It’s proven to be usability.
Analysis of the Working Characteristics of High-Pile Wharf Pile Foundation under Berthing Load
Applied Mechanics and Materials ; 256-259 ; 1946-1951
2012-12-13
6 pages
Article (Journal)
Electronic Resource
English
Analysis of the Working Characteristics of High-Pile Wharf Pile Foundation under Berthing Load
British Library Conference Proceedings | 2012
|British Library Conference Proceedings | 2015
|Trans Tech Publications | 2015
|High-pile wharf with separated berthing, loading and unloading functions
European Patent Office | 2024
|European Patent Office | 2020
|