Optimized reinforcement in longitudinal joints of segmental tunnel linings
When building tunnels using segmental lining, the segmental lining takes over the supporting role of the excavated soil. With the workspace in tunnel construction being very constricted the circular, segmental linings are divided into small segments called tubbings which are assembled by a tunnel boring machine. This kind of construction results in numerous longitudinal and circumferential joints. The loading situation for the longitudinal joints is typically dominated by the compressive normal forces combined with relatively small bending moments. The thickness of the tubbings usually depends on the longitudinal joints of the individual segments. The cross‐sectional area of the tubbings has to be reduced at the joints in order to avoid spalling of the concrete leading to higher compression in the joints themselves. The Institute of Structural Engineering of TU Wien developed a new reinforcement design for tubbings with strengthened longitudinal joints. With a patent application pending, the newly designed joints were manufactured and tested demonstrating that the TU Wien proposal significantly increases the load‐bearing capacity of the tubbings in comparison to conventional tubbing solutions. The very satisfying results, obtained from the large‐scale tests of the newly developed joint design, show great potential for the construction of tunnels with thinner tubbings in the near future.
Optimiertes Bewehrungskonzept für Tübbing‐Längsfugen im Segmenttunnelbau
Bei der Errichtung von Tunneln mit Fertigteilsegmenten übernimmt die Tunnelschale die Tragwirkung des ausgebrochenen Gebirgsmaterials. Da die Platzverhältnisse im Tunnelbau stark beschränkt sind, ist die Tunnelschale in einzelne Segmente unterteilt. Die Begrenzungsflächen zwischen den Tübbingen werden in Längs‐ und Ringfugen unterteilt. In den Tübbing‐Längsfugen sind typischerweise hohe Drucknormalkräfte in Kombination mit relativ kleinen Biegemomenten vorherrschend. Für die Dicke der Tübbinge ist häufig die Bemessung der Tübbing‐Längsfugen maßgebend. Dies resultiert aus dem Umstand, dass die Regelquerschnittsfläche der Tübbinge im Bereich der Längsfugen reduziert werden muss, um ein Abplatzen der Betonkanten zu verhindern. Die dadurch entstehenden hohen Druckspannungen im Bereich der Tübbinglängsfugen sind ein wesentlicher Faktor bei der Bemessung der Tübbinge. Das Institut für Tragkonstruktionen der TU Wien hat ein neues Bewehrungskonzept für Tübbinge entwickelt, dass zu einer Verbesserung der Tragfähigkeit der Tübbing‐Längsfuge führt. Basierend auf einer Patentanmeldung der TU Wien wurde das optimierte Bewehrungskonzept in einer Versuchsserie getestet und gezeigt, dass das optimierte Bewehrungskonzept die Tragfähigkeit der Tübbinge signifikant steigert. Die Großversuche lieferten sehr zufriedenstellende Ergebnisse und lassen auf das große Potenzial für den Bau von dünneren und tragfähigeren Tunnelschalen schließen.
Optimized reinforcement in longitudinal joints of segmental tunnel linings
When building tunnels using segmental lining, the segmental lining takes over the supporting role of the excavated soil. With the workspace in tunnel construction being very constricted the circular, segmental linings are divided into small segments called tubbings which are assembled by a tunnel boring machine. This kind of construction results in numerous longitudinal and circumferential joints. The loading situation for the longitudinal joints is typically dominated by the compressive normal forces combined with relatively small bending moments. The thickness of the tubbings usually depends on the longitudinal joints of the individual segments. The cross‐sectional area of the tubbings has to be reduced at the joints in order to avoid spalling of the concrete leading to higher compression in the joints themselves. The Institute of Structural Engineering of TU Wien developed a new reinforcement design for tubbings with strengthened longitudinal joints. With a patent application pending, the newly designed joints were manufactured and tested demonstrating that the TU Wien proposal significantly increases the load‐bearing capacity of the tubbings in comparison to conventional tubbing solutions. The very satisfying results, obtained from the large‐scale tests of the newly developed joint design, show great potential for the construction of tunnels with thinner tubbings in the near future.
Optimiertes Bewehrungskonzept für Tübbing‐Längsfugen im Segmenttunnelbau
Bei der Errichtung von Tunneln mit Fertigteilsegmenten übernimmt die Tunnelschale die Tragwirkung des ausgebrochenen Gebirgsmaterials. Da die Platzverhältnisse im Tunnelbau stark beschränkt sind, ist die Tunnelschale in einzelne Segmente unterteilt. Die Begrenzungsflächen zwischen den Tübbingen werden in Längs‐ und Ringfugen unterteilt. In den Tübbing‐Längsfugen sind typischerweise hohe Drucknormalkräfte in Kombination mit relativ kleinen Biegemomenten vorherrschend. Für die Dicke der Tübbinge ist häufig die Bemessung der Tübbing‐Längsfugen maßgebend. Dies resultiert aus dem Umstand, dass die Regelquerschnittsfläche der Tübbinge im Bereich der Längsfugen reduziert werden muss, um ein Abplatzen der Betonkanten zu verhindern. Die dadurch entstehenden hohen Druckspannungen im Bereich der Tübbinglängsfugen sind ein wesentlicher Faktor bei der Bemessung der Tübbinge. Das Institut für Tragkonstruktionen der TU Wien hat ein neues Bewehrungskonzept für Tübbinge entwickelt, dass zu einer Verbesserung der Tragfähigkeit der Tübbing‐Längsfuge führt. Basierend auf einer Patentanmeldung der TU Wien wurde das optimierte Bewehrungskonzept in einer Versuchsserie getestet und gezeigt, dass das optimierte Bewehrungskonzept die Tragfähigkeit der Tübbinge signifikant steigert. Die Großversuche lieferten sehr zufriedenstellende Ergebnisse und lassen auf das große Potenzial für den Bau von dünneren und tragfähigeren Tunnelschalen schließen.
Optimized reinforcement in longitudinal joints of segmental tunnel linings
Proksch‐Weilguni, Clemens (author) / Wolfger, Hannes (author) / Kollegger, Johann (author)
Geomechanics and Tunnelling ; 14 ; 390-399
2021-08-01
10 pages
Article (Journal)
Electronic Resource
English
Neue Verfahren/Versuchstechnik , innovatives Design , Statik , Fertigteilsegmente , Maschineller Vortrieb , Bewehrung Tübbing‐Längsfuge , Tübbing joint reinforcement , Structural analysis , Precast tunnel segments , innovative design , Mechanized tunneling , Innovative procedures/test techniques , tubbing
Radial Joints for Precast Segmental Tunnel Linings