A platform for research: civil engineering, architecture and urbanism
Rome metro line C: Breakthrough using equipment provided with hydraulic seal
Rome metro line C: Breakthrough using equipment provided with hydraulic seal
Rome metro line C: Breakthrough using equipment provided with hydraulic seal
Gulino, Gianluca (author) / Barbanti, Marco (author) / Paolini, Tommaso (author)
Geomechanics and Tunnelling ; 4 ; 166-169
2011-04-01
4 pages
Article (Journal)
Electronic Resource
English
Rome starts work on third metro line
British Library Online Contents | 2001
Rome starts work on third metro line
IuD Bahn | 2001
|Last breakthrough of New Delhi Metro TBM
IuD Bahn | 2005
|Breakthrough on the second leg of the Caracas Metro Line 3 extension
Online Contents | 2006
Last breakthrough of the New Delhi Metro TBM
British Library Online Contents | 2005
|