A platform for research: civil engineering, architecture and urbanism
Cover Picture: Geomechanics and Tunnelling 3/2017
The tunnels Deutsch Grutschen and Langer Berg are two bored tunnels being mined underground. Between the double tubes of both tunnels crosscuts are placed approx. every 500 m. DSI Underground Austria as a system supplier brought a variety of its products on site, details can be found starting on page 318–320.
Die Tunnel Deutsch Grutschen und Langer Berg werden doppelröhrig in geschlossener Bauweise erstellt. Zwischen den Doppelröhren beider Tunnel werden alle 500 m Querschläge erstellt. DSI Underground Austria GmbH als Systemlieferant brachte das passende Sortiment seiner Produkte auf die Baustelle, Details sind auf den Seiten 318–320 zu finden.
Cover Picture: Geomechanics and Tunnelling 3/2017
The tunnels Deutsch Grutschen and Langer Berg are two bored tunnels being mined underground. Between the double tubes of both tunnels crosscuts are placed approx. every 500 m. DSI Underground Austria as a system supplier brought a variety of its products on site, details can be found starting on page 318–320.
Die Tunnel Deutsch Grutschen und Langer Berg werden doppelröhrig in geschlossener Bauweise erstellt. Zwischen den Doppelröhren beider Tunnel werden alle 500 m Querschläge erstellt. DSI Underground Austria GmbH als Systemlieferant brachte das passende Sortiment seiner Produkte auf die Baustelle, Details sind auf den Seiten 318–320 zu finden.
Cover Picture: Geomechanics and Tunnelling 3/2017
2017-06-01
1 pages
Article (Journal)
Electronic Resource
English
Cover Picture: Geomechanics and Tunnelling 1/2017
Wiley | 2017
Cover Picture: Geomechanics and Tunnelling 6/2017
Wiley | 2017
Cover Picture: Geomechanics and Tunnelling 4/2017
Wiley | 2017
Cover Picture: Geomechanics and Tunnelling 2/2017
Wiley | 2017
Cover Picture: Geomechanics and Tunnelling 5/2017
Wiley | 2017