A platform for research: civil engineering, architecture and urbanism
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
This article presents Chapter 16, Trenching, Pipelaying, and Backfilling, of the AWWA Committee Report on the Design and Installation of Steel Water Pipe. The chapter discusses trenching, installation of pipe, hydrostatic test, allowable leakage, backfilling, sanitary precautions, freezing in pipelines, and warming of water in exposed pipelines.
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
This article presents Chapter 16, Trenching, Pipelaying, and Backfilling, of the AWWA Committee Report on the Design and Installation of Steel Water Pipe. The chapter discusses trenching, installation of pipe, hydrostatic test, allowable leakage, backfilling, sanitary precautions, freezing in pipelines, and warming of water in exposed pipelines.
CHAPTER 16 – Trenching, Pipelaying, and Backfilling: AWWA Steel Pipe Committee Report
Journal ‐ American Water Works Association ; 54 ; 1138-1155
1962-09-01
18 pages
Article (Journal)
Electronic Resource
English
Design , Freezing , Steel Pipe , Installation , Pipelines , Pipes
Field Joints AWWA Steel Pipe Committee Report
Wiley | 1962