A platform for research: civil engineering, architecture and urbanism
Cover Picture: Special Edition 2008
10.1002/best.200890039.abs
The cover picture shows the Kaste dam in Lesotho 1996 during construction. Due to high rainfall in the beginning of 1996 the control outlet had to be opened to limit the increase of the water level. The 1996/97 finished dam has a length of 710 m and a height of 185 m. The dam is part of the Lesotho Highlands Water Project which includes several dams and was planned to ensure water supply to major industrial centres of South Africa.
Cover Picture: Special Edition 2008
10.1002/best.200890039.abs
The cover picture shows the Kaste dam in Lesotho 1996 during construction. Due to high rainfall in the beginning of 1996 the control outlet had to be opened to limit the increase of the water level. The 1996/97 finished dam has a length of 710 m and a height of 185 m. The dam is part of the Lesotho Highlands Water Project which includes several dams and was planned to ensure water supply to major industrial centres of South Africa.
Cover Picture: Special Edition 2008
Beton‐ und Stahlbetonbau ; 103
2008-04-01
1 pages
Article (Journal)
Electronic Resource
English
Cover Picture: Special Edition 2007
Wiley | 2007
Cover Picture: (Adv. Mater. 15/2008)
British Library Online Contents | 2008
Cover Picture: (Adv. Mater. 16/2008)
British Library Online Contents | 2008
I SALONI 2008: Special edition
Online Contents | 2008
|Cover Picture - Materialwissenschaft und Werkstofftechnik 10/2008
British Library Online Contents | 2008