A platform for research: civil engineering, architecture and urbanism
Cover Picture: Special Edition 2007
10.1002/best.200790114.abs
Not far from the Kuwaiti capital, the Jaber Al‐Ahmed International Stadium is under construction, on a surface area of 400,000 m2. For the “skeleton” of the stadium, consisting of 52 wall piers with inclined cantilevering stepped beams, Doka is supplying formwork solutions that need no falsework support. A special feature of this site is the climbing cantilever formwork, specially developed for the stepped beams. Compared to supporting these beams completely from ground level, this solution delivers huge savings in terms of both equipment and labour time. (Doka Schalungstechnik)
Cover Picture: Special Edition 2007
10.1002/best.200790114.abs
Not far from the Kuwaiti capital, the Jaber Al‐Ahmed International Stadium is under construction, on a surface area of 400,000 m2. For the “skeleton” of the stadium, consisting of 52 wall piers with inclined cantilevering stepped beams, Doka is supplying formwork solutions that need no falsework support. A special feature of this site is the climbing cantilever formwork, specially developed for the stepped beams. Compared to supporting these beams completely from ground level, this solution delivers huge savings in terms of both equipment and labour time. (Doka Schalungstechnik)
Cover Picture: Special Edition 2007
Beton‐ und Stahlbetonbau ; 102
2007-09-01
1 pages
Article (Journal)
Electronic Resource
English
Cover Picture: Special Edition 2008
Wiley | 2008
Cover Picture - Materialwissenschaft und Werkstofftechnik 4/2007
British Library Online Contents | 2007
Cover Picture - Materialwissenschaft und Werkstofftechnik 3/2007
British Library Online Contents | 2007
Cover Picture - Materialwissenschaft und Werkstofftechnik 5/2007
British Library Online Contents | 2007
Cover Picture - Materialwissenschaft und Werkstofftechnik 7/2007
British Library Online Contents | 2007