A platform for research: civil engineering, architecture and urbanism
Cover Picture: Steel Construction 1/2020
For Schorgast Bridge Full Locked Coil Rope high strength tension components have been designed and implemented as stay cables. As part of the revision of EN 1993‐1‐11 the fatigue design rules for tension components have been modified and adjusted. An article in this edition provides insight and background information (Annan, R. et al., pp. 61–75)
Cover Picture: Steel Construction 1/2020
For Schorgast Bridge Full Locked Coil Rope high strength tension components have been designed and implemented as stay cables. As part of the revision of EN 1993‐1‐11 the fatigue design rules for tension components have been modified and adjusted. An article in this edition provides insight and background information (Annan, R. et al., pp. 61–75)
Cover Picture: Steel Construction 1/2020
Steel Construction ; 13
2020-02-01
1 pages
Article (Journal)
Electronic Resource
German
Cover Picture: Steel Construction 4/2020
Wiley | 2020
Cover Picture: Steel Construction 3/2020
Wiley | 2020
Cover Picture: Steel Construction 2/2020
Wiley | 2020
Cover Picture: Steel Construction 4/2021
Wiley | 2021
Cover Picture: Steel Construction 4/2016
Wiley | 2016