A platform for research: civil engineering, architecture and urbanism
Research on pipe materials for tunnel drainage by the ÖBB Task Force DrainageForschung der ÖBB‐Task Force Drainage zu Rohrmaterialien der Tunnelentwässerung
Due to the additional tunnels that are currently under design or construction, drainage maintenance costs are expected to rise significantly over the next few years. An increased amount of maintenance will also be necessary due to older drainage pipes damaged during intensive cleaning and flushing. To counter these problems, an internal task force for drainage pipes has been installed within the ÖBB. Together with research institutions from several fields of science, projects are being carried out to find ways to decrease the overall maintenance effort. Topics include screening of possible rehabilitation methods for damaged pipes, and investigation of currently used materials with regard to their mechanical suitability. A multi‐disciplinary research topic has also been initiated to investigate the potential of material modifications with the goal to decrease overall precipitation in drainage pipes and associated maintenance. First results on modified materials already show potential to decrease calcite precipitation.
Aufgrund der aktuell in Bau befindlichen Tunnelbauwerke wird sich der Aufwand für die Instandhaltung von Bauwerksdrainagen bei der ÖBB innerhalb der nächsten Jahre vervielfachen. Ein weiteres Problem stellen ältere Tunneldrainagen dar, die durch intensive Reinigung beschädigt werden und einen zusätzlichen Instandhaltungsaufwand bedeuten. Ausgehend von diesen Problemstellungen wurde innerhalb der ÖBB die Task Force Drainage gegründet. Gemeinsam mit Forschungspartnern aus verschiedenen Fachdisziplinen wird derzeit untersucht, wie die Instandhaltung optimiert werden kann. Dabei werden sowohl potenzielle Möglichkeiten zur Instandsetzung als auch die Materialeignung der derzeit verbauten Drainagen untersucht. Zusätzlich wird versucht in einem Disziplinen‐übergreifenden Projekt neue Materialien mit verringertem Versinterungspotenzial und einhergehender Reduktion des Reinigungsaufwands zu entwickeln. Erste Untersuchungen zeigen dabei bereits auf, dass Potenzial hinsichtlich Materialoptimierung gegeben ist.
Research on pipe materials for tunnel drainage by the ÖBB Task Force DrainageForschung der ÖBB‐Task Force Drainage zu Rohrmaterialien der Tunnelentwässerung
Due to the additional tunnels that are currently under design or construction, drainage maintenance costs are expected to rise significantly over the next few years. An increased amount of maintenance will also be necessary due to older drainage pipes damaged during intensive cleaning and flushing. To counter these problems, an internal task force for drainage pipes has been installed within the ÖBB. Together with research institutions from several fields of science, projects are being carried out to find ways to decrease the overall maintenance effort. Topics include screening of possible rehabilitation methods for damaged pipes, and investigation of currently used materials with regard to their mechanical suitability. A multi‐disciplinary research topic has also been initiated to investigate the potential of material modifications with the goal to decrease overall precipitation in drainage pipes and associated maintenance. First results on modified materials already show potential to decrease calcite precipitation.
Aufgrund der aktuell in Bau befindlichen Tunnelbauwerke wird sich der Aufwand für die Instandhaltung von Bauwerksdrainagen bei der ÖBB innerhalb der nächsten Jahre vervielfachen. Ein weiteres Problem stellen ältere Tunneldrainagen dar, die durch intensive Reinigung beschädigt werden und einen zusätzlichen Instandhaltungsaufwand bedeuten. Ausgehend von diesen Problemstellungen wurde innerhalb der ÖBB die Task Force Drainage gegründet. Gemeinsam mit Forschungspartnern aus verschiedenen Fachdisziplinen wird derzeit untersucht, wie die Instandhaltung optimiert werden kann. Dabei werden sowohl potenzielle Möglichkeiten zur Instandsetzung als auch die Materialeignung der derzeit verbauten Drainagen untersucht. Zusätzlich wird versucht in einem Disziplinen‐übergreifenden Projekt neue Materialien mit verringertem Versinterungspotenzial und einhergehender Reduktion des Reinigungsaufwands zu entwickeln. Erste Untersuchungen zeigen dabei bereits auf, dass Potenzial hinsichtlich Materialoptimierung gegeben ist.
Research on pipe materials for tunnel drainage by the ÖBB Task Force DrainageForschung der ÖBB‐Task Force Drainage zu Rohrmaterialien der Tunnelentwässerung
Schachinger, Tobias (author) / Arbeiter, Florian J. (author) / Eichinger, Stefanie (author) / Saliger, Florian (author)
Geomechanics and Tunnelling ; 12 ; 467-471
2019-10-01
5 pages
Article (Journal)
Electronic Resource
English
West Virginia Surface Mine Drainage Task Force
British Library Conference Proceedings | 1992
|Agricultural Drainage Management Systems Task Force (ADMSTF)
British Library Conference Proceedings | 2009
|Task Force Drainage (TFD) – The project for life after
Wiley | 2017
|