A platform for research: civil engineering, architecture and urbanism
The New Semmering Base Tunnel – project overview / Der Semmering‐Basistunnel neu – das Projekt im Überblick
The New Semmering Base Tunnel (SBTn) has been designed with a flat gradient to meet the requirement for uniform high‐speed rail infrastructure for the new Südbahn line, which is considered an internationally significant transport corridor for Austria as an industrial location. The 27.3 km tunnel is divided into a number of construction sections with separate contracts due to the geological and hydrogeological conditions. In addition to the tunnel drives from the Gloggnitz portal, the tunnel will also be driven from three intermediate starting points. The individual tunnelling contracts will be started at intervals of about one year. The first tunnelling contract starts in 2014 in the Fröschnitzgraben, the drives in Gloggnitz and the intermediate starting point at Göstritz in 2015 and the tunnel drive in Grautschenhof from 2016. From 2021, when all tunnelling works have been completed and the structure of the two running tunnels has been completed, the installation of the tunnel equipment will start. Opening for service is intended for the end of 2014.
Der Semmering‐Basistunnel neu (SBTn) wurde gemäß den Vorgaben zur Bereitstellung einer einheitlich leistungsfähigen Eisenbahninfrastruktur für die neue Südbahn, die als international bedeutende Verkehrsachse für den Wirtschaftsstandort Österreich gilt, mit einer flachen Neigung konzipiert. Der 27,3 km lange Tunnel wird aufgrund der geologischen und hydrogeologischen Verhältnisse sowie der baulogistischen und tunnelbautechnischen Anforderungen in mehreren Bauabschnitten mit unterschiedlichen Baulosen errichtet. Neben den Vortrieben vom Portal Gloggnitz wird der Tunnel über drei Zwischenangriffe aufgefahren. Die einzelnen Tunnelbaulose werden gestaffelt in Abständen von etwa einem Jahr begonnen. Das erste Tunnelbaulos startet 2014 im Fröschnitzgraben, 2015 beginnen die Vortriebe in Gloggnitz und beim Zwischenangriff Göstritz, ab 2016 erfolgt der Tunnelvortrieb in Grautschenhof. Ab 2021, wenn alle Vortriebsarbeiten abgeschlossen und die beiden Tunnelröhren im Rohbau durchgängig fertiggestellt sind, beginnt der Einbau der Tunnelausrüstung. Die Inbetriebnahme ist Ende 2024 vorgesehen.
The New Semmering Base Tunnel – project overview / Der Semmering‐Basistunnel neu – das Projekt im Überblick
The New Semmering Base Tunnel (SBTn) has been designed with a flat gradient to meet the requirement for uniform high‐speed rail infrastructure for the new Südbahn line, which is considered an internationally significant transport corridor for Austria as an industrial location. The 27.3 km tunnel is divided into a number of construction sections with separate contracts due to the geological and hydrogeological conditions. In addition to the tunnel drives from the Gloggnitz portal, the tunnel will also be driven from three intermediate starting points. The individual tunnelling contracts will be started at intervals of about one year. The first tunnelling contract starts in 2014 in the Fröschnitzgraben, the drives in Gloggnitz and the intermediate starting point at Göstritz in 2015 and the tunnel drive in Grautschenhof from 2016. From 2021, when all tunnelling works have been completed and the structure of the two running tunnels has been completed, the installation of the tunnel equipment will start. Opening for service is intended for the end of 2014.
Der Semmering‐Basistunnel neu (SBTn) wurde gemäß den Vorgaben zur Bereitstellung einer einheitlich leistungsfähigen Eisenbahninfrastruktur für die neue Südbahn, die als international bedeutende Verkehrsachse für den Wirtschaftsstandort Österreich gilt, mit einer flachen Neigung konzipiert. Der 27,3 km lange Tunnel wird aufgrund der geologischen und hydrogeologischen Verhältnisse sowie der baulogistischen und tunnelbautechnischen Anforderungen in mehreren Bauabschnitten mit unterschiedlichen Baulosen errichtet. Neben den Vortrieben vom Portal Gloggnitz wird der Tunnel über drei Zwischenangriffe aufgefahren. Die einzelnen Tunnelbaulose werden gestaffelt in Abständen von etwa einem Jahr begonnen. Das erste Tunnelbaulos startet 2014 im Fröschnitzgraben, 2015 beginnen die Vortriebe in Gloggnitz und beim Zwischenangriff Göstritz, ab 2016 erfolgt der Tunnelvortrieb in Grautschenhof. Ab 2021, wenn alle Vortriebsarbeiten abgeschlossen und die beiden Tunnelröhren im Rohbau durchgängig fertiggestellt sind, beginnt der Einbau der Tunnelausrüstung. Die Inbetriebnahme ist Ende 2024 vorgesehen.
The New Semmering Base Tunnel – project overview / Der Semmering‐Basistunnel neu – das Projekt im Überblick
Gobiet, Gerhard (author)
Geomechanics and Tunnelling ; 6 ; 680-687
2013-12-01
8 pages
Article (Journal)
Electronic Resource
English
Das Projekt Semmering‐Basistunnel neu
Online Contents | 2013
|Das Projekt Semmering‐Basistunnel neu
Wiley | 2013
|Semmering-Basistunnel, ein Projektsüberblick
Tema Archive | 1995
|