A platform for research: civil engineering, architecture and urbanism
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Unique erection method for Amakogawa bridge - an inverted Langer fixed arch bridge
Horiguchi, M. (author) / Sadamitsu, M. (author) / Nakahara, J. (author) / Okada, K. (author) / Federation Internationale de la Precontrainte
12th Congress, FIP '94 ; 1994 ; Washington; DC
1994-01-01
F114-F119
2; vols
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Prefabricated inverted arch bridge girder erection machine and using method thereof
European Patent Office | 2023
|Prefabricated inverted arch bridge girder erection machine and using method thereof
European Patent Office | 2023
|A Prestress Concrete Bridge with an Inverted Langer Arch in Liyutan Bridge Construction Project
British Library Conference Proceedings | 1995
|Closure to Erection of Arch Bridge
ASCE | 2021
|Discussion on Erection of Arch Bridge
ASCE | 2021
|